Showing posts with label Industry Standards. Show all posts
Showing posts with label Industry Standards. Show all posts

Wednesday, 22 October 2014

Where was the first Travelator Installed?




A Moving Walkway or Travelator is a slow moving conveyor mechanism that is used for the horizontal transportation of people over short to medium distances. They can also be installed with a slight incline.  The primary benefit of a travelator is that it can greatly decrease passenger travel time in areas where there is a high volume of passenger traffic – airports and train stations being two of the most common locations. The word Trav-O-Lator is a registered brand name belonging to the Otis Elevator Company.  You can read more about the Founder of Otis here.

When was the first travelator?

The late 19th century was a time when the founding fathers of the Vertical Transportation industry were manufacturing and installing ever more sophisticated vertical transportation systems around the world.  The first ‘Double Deck Elevator’ was installed in the Eiffel Tower in 1889, for example. This was also the time they turned their focus to moving walkways or travelators.

The first moving walkway debut at the World's Columbian Exposition of 1893, in Chicago, Illinois. Passengers could choose to sit on one section or alternatively they could stand or walk in another section. It was installed down the length of a lakefront pier and passengers were horizontally transported to a casino.

The next moving walkway was presented to the public in Paris at the Paris Exposition Universelle in 1900. That walkway consisted of three elevated platforms: the first platform was stationary, the second moved at a moderate speed and the third moved at about six miles an hour.

Given these very public demonstrations in 1893 and 1900 it is perhaps surprising that the first commercial walkway in the United States was introduced over 50 years later in 1954. The walkway was installed at the Pavonia Terminal inside the Hudson & Manhattan Railroad Erie station in Jersey City, NJ. Named the "Speedwalk" and built by Goodyear, it was 277 ft in length and moved up a 10 percent gradient at a speed of 1.5 mph.

It was 6 years later that the first moving walkway was installed in the London Underground at Bank Station. Bank Station’s Travelator was also the first moving walkway installed anywhere in Europe and was opened with much fanfare on 27th September 1960. Click here to view news footage of the opening ceremony. The system installed was the Otis Trav-O-Lator.

Are there any High Speed Travelators?

Since the 1960s there have been many projects investigating the practicality of creating high speed travelators. Ultimately the vast majority of these high speed travelators have not been put into public usage or have been abandoned during testing due to safety concerns. However, a high-speed walkway was installed in the Montparnasse—Bienvenüe Métro station in Paris in 2002. During 2009 it was announced that because of its unreliability and the number of users having accidents the high speed walkway would be replaced with a standard moving walkway. This replacement was made in 2011.

Where are moving walkways typically used?

In addition to airports travelators are often used in the following locations: museum exhibits, zoos, theme parks, theatre, public transport, urban areas, ski resorts, supermarkets. In the UK, The Tower of London uses a moving walkway to horizontally transport visitors passed the cabinets that contain the Crown Jewels to minimize congestion.

Dunbar and Boardman is the lift, escalator and access equipment consultancy. Do you have a current or planned project that includes Travelators? We would be happy to discuss any such requirements and how we may be able to assist. Give us a call on T +44 (0) 20 7739 5093 or send us an email via peterboardman@dunbarboardman.com to start the conversation. We look forward to hearing from you.

Thursday, 19 June 2014

Why use a consultancy for Façade Access and Building Maintenance Units?


Creating Façade Access systems and deploying the correct Building Maintenance Units (BMU) or Mobile Elevated Work Platform (MEWP) is specialised work that requires both project management experience and a detailed knowledge of the technology and technological advances in the industry. The requirements of each building will be different and very often are complex. This complexity is one of the reasons that companies around the world choose to work with a specialist consultancy for Façade Access & BMUs. The other major reasons are listed below.

Planning

The development of a Façade Access solution is a long term process and the building maintenance strategy will be ongoing over the life of the building. It is essential that a maintenance strategy is considered and incorporated into the initial building design and implemented during the construction phases. The maintenance programme and longevity of the equipment must be considered. A consultancy will be able to achieve all of this and enable the facility management team to use the maintenance equipment for a minimum of 25 years.

Efficiency

When creating a schedule of Façade Access and selecting the most suitable solution a key objective will be the need to optimise the usage of the access equipment, as well as the operability of the Façade Cleaning Equipment (FCE).  By choosing a consultancy to manage the process a company reduces the risk of making a poor choice, in addition the consultancy will carry professional indemnity insurance to give further peace of mind.

Bespoke Solutions

If a developer or client were to approach a manufacturer directly there is a real chance that they would be guided into the purchase of one of the manufacturer’s existing product solutions. An evaluation based on the commercial interests of the manufacturer would be undertaken; rather than the comprehensive and unfettered approach taken by a specialist consultancy. Using a consultancy ensures that the best solution will be sought and found.

Independence

A consultancy can set up and manage a formal tender process with 3 or 4 bidders and invite them to submit a tender for the project.  Following post tender evaluation the most appropriate solution and supplier can be chosen. The final decision and award of the contract will be based completely on merit.

Commercial Negotiations

Consultancies are aware of industry norms and charging rates and therefore have a stronger hand when it comes to negotiating commercial contracts. Using a consultancy could save you money in the short and long term. Naturally the possibility and scope of any saving can only be assessed on a case-by-case basis.

Industry & Legislative Standards

A consultancy will be able to create façade-cleaning solutions that minimize the impact on building design and meet the highest safety according to EN standards. Furthermore they will be able to ensure that the equipment is provided within International Quality & Safety Standards and that health & safety requirements for the particular environment are met.

Dunbar and Boardman is a specialist consultancy that has provided global clients with bespoke solutions for façade access equipment and BMUs for over 30 years.

Do you have a current or planned project that would benefit from our expertise? We would be happy to discuss with you. Give us a call on T +44 (0) 20 7739 5093 or send us an email via peterboardman@dunbarboardman.com to start the conversation. We look forward to hearing from you.